auschwitzmuseum,
@auschwitzmuseum@mastodon.world avatar

15 May 1942 | The renovation work in the crematorium at Auschwitz I has been completed.

The underground flue duct between the furnaces and the chimney has been repaired; walls and vaulting have been constructed above the room housing the engine next to the chimney; a fan connected to it has been installed to assist the draft of the furnaces.

Additionally, repairs have been carried out on one of the corpse-loading trolleys.

  • All
  • Subscribed
  • Moderated
  • Favorites
  • random
  • ngwrru68w68
  • rosin
  • GTA5RPClips
  • osvaldo12
  • love
  • Youngstown
  • slotface
  • khanakhh
  • everett
  • kavyap
  • mdbf
  • DreamBathrooms
  • thenastyranch
  • magazineikmin
  • anitta
  • InstantRegret
  • normalnudes
  • tacticalgear
  • cubers
  • ethstaker
  • modclub
  • cisconetworking
  • Durango
  • provamag3
  • tester
  • Leos
  • megavids
  • JUstTest
  • All magazines